Description of the additional lightning
impulse overshoots evaluation (beta2).
The beta evaluation is not changed, because this
evaluation according to the IEC standards. Please see
TDG- curves evaluation results.
1. Found the points of the tangent
Near
by the peak value we search the points. With this tow points we calculate the
tangent.
2. BETA 2
The
beta 2 value is the difference between the maximum peak value and the cross point
with the tangent.
e.g. X ,Y zoomed curve:
Beta
2 = 5,2%, horizontal
line to the rise time line.
Beta 0,5% tangent
Results
in the right window.